The major primary beams and secondary beams are also shown, even as Utility stations so that the most efficient route for utilities can be determined. Process equipment and piping have priority on the Piping Arrangement. In complex systems, where orthographic views do not illustrate the details of the design, pictorial view in isometric presentation is made for clarity. Orthographic drawings are views (front, side, top etc.) of an piping system, and in Piping they are called 'Piping Arrangements'.Īn orthographic view shows only one side, and therefore multiple drawings (views) are necessary to show a complete Piping Arrangement. There are two types of views in hand-drawn piping drawings.
Piping Arrangement Views in Piping Drawings